Verify Completeness and Conformity with the Construction Documents, Specs, Codes, and Inspector Special Requests.
All Trades and Disciplines, from the Groundbreaking thru the Closeout Process.
HERS HVAC Performance/Installation Reporting
Design of RFI solutions. Confirm acceptable by the AOR and/or EOR.
Shop Drawings, Sketches, and As-Builts drafted via AutoCad as needed to move the project forward on schedule for CofO and/or Closeout and Retention.
Find, Issue, and Distribute RFI’s.
Coordination and Verification of RFI and Submittal Execution.
Organization of Construction Documents, Internal and Distribution to the Subs.
Run OAC Meetings, and Weekly Internal Team Meetings.
Assembly of Roof Equipment, Electrical Box Out / Make Up, General Site Work for GC temp facilities.
Detail Drawings Performed On Site. Same Day Solutions to Field Constraints.